The Effect of Risk Management at Project Planning Phase on Performance of Construction Projects in Pakistan
Abstract
Purpose: This research/investigation indorses a very good and systematized risk management method throughout planning stage of the project and with the contribution of construction specialists, end users and engineers.
Methodology: The exploration project utilized quantitative examination plan. The examination study was both expressive and illustrative. The examination study was enlightening as it attempts to reaction the topic of what hazard the executives practices ought to be remembered for development projects arranging stage.
Findings: The research study has successfully achieved its objective to identify the impact of risk identification, engineer/architect selection. All four hypotheses were accepted indicating; all the independent variables were positively related to project performance. There is strong positive relation between risk identification, engineer/architect selection and Project performance. There is a weak positive relation between sit selection, preliminary schedule and budget & Project performance.
Implications: The researcher recommends the construction professional to focus on two major things during project planning which has greater impact over project performance, risk identification and engineer/architect selection.
Downloads
Article Analytics Summary
References
Ahmed, A., Kayis, B., & Amornsawadwatana, S. (2007). A review of techniques for risk management in projects. Benchmark International Journal, 14(1), 22-36 DOI: https://doi.org/10.1108/14635770710730919
Assaf, S., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349-357. Retrieved from DOI: https://doi.org/10.1016/j.ijproman.2005.11.010
Carbone, T. A., & Tippet, D. D. (2004). Project Risk Management Using the Project Risk FMEA. Engineering Management Journal, 16(4), 28-35. Retrieved from http://www.fmeainfocentre.com DOI: https://doi.org/10.1080/10429247.2004.11415263
Choge, K. J., & Muturi, W. M. (2014). Factors affecting adherence to cost estimates: A survey of construction projects of Kenya National Highways Authority. International Journal of Social Sciences and Entrepreneurship, 1, 689-705.
Central Development Working Party (CDWP,2018)
Dvir, D., Raz, T., & Shenhar, A. J. (2003). An empirical analysis of the relationship between project planning and project success. International journal of project management, 21(2), 89-95. DOI: https://doi.org/10.1016/S0263-7863(02)00012-1
Eskesen, S. D., Tengborg, P., Kampmann, J., & Veicherts, T. H. (2004). Guidelines for tunnelling risk management, International Tunnelling Association (19(3)). DOI: https://doi.org/10.1016/j.tust.2004.01.001
Fageha, M. K., & Aibinu, A. A. (2014). A Procedure for Involving Stakeholders when Measuring ProjectScope Definition Completeness at Pre-project Planning Stage. AIPM NATIONAL 2014 CONFERENCE PROCEEDINGS, 1-8. Retrieved from
Flanagan, R., Norman, G., & Chapman, R. (2006). Risk management and construction (2nd ed.). Oxford: Blackwell Publisher
ICE (2005). RAMP - Risk Analysis and Management for Projects: A Strategic Framework for Managing Project Risk and its Financial Implications (2nd ed.). London: Thomas Telford Publishing
Idoro, G. (2012). Evaluating levels of project planning and their effects on performance in the Nigerian construction industry. Construction Economics and Building, 9(2), 39-50 DOI: https://doi.org/10.5130/AJCEB.v9i2.3020
Kaplan, S. (1997). The words of risk analysis. Risk Analysis (17), pp. 407-417. DOI: https://doi.org/10.1111/j.1539-6924.1997.tb00881.x
Kerzner, H. (2009). Project Management: A systems approach to planning, scheduling, and controlling (10th ed.). New Jersy: John Wiley and Sons.
Gitau LM, 2015.THE EFFECTS OF RISK MANAGEMENT AT PROJECT PLANNING PHASE ON PERFORMANCE OF CONSTRUCTION PROJECTS IN RAWANDA. A Dissertation of Ms Thesis.
GSA (2001). The Site Selection Guide (1st ed.). Washington DC: AIA.
Hyunju Jeong, John C. Crittenden, and Ming Xu Messner Meeting on Dec 16, 2009. Panama Canal case study.
Lemma, T. (2014). The role of project planning on project performance in Ethiopia. A Dissertation of MA Thesis.
Morris, P., & Hough, G. H. (1988).The Anatomy of Major Projects: A Study of the Reality of Project Management (1st ed.). New York: Wiley
Murphy, D. C., Baker, B. N., & Fisher, D. (1974). Determinants of project success, Grant No. NGR 22-003-028 for National Aeronautics and Space Administration, Management Institute, School of Management, Boston College, Boston, MA
Olwale, Y. A., & Sung, M. (2010). Inhibiting factors and mitigating measures in practice.Construction Management and Economics,28, 509-526. Retrieved from http://eprints.aston.ac.uk/15566/2/Cost_and_time_control_inbiting_factors_and_mitigating_measures.pdf DOI: https://doi.org/10.1080/01446191003674519
PMI (2018). Project Management Body of Knowledge (PMBOK Guide) (6th ed.) Pennsylvania,USA: Project Managment Institute In
Parker, D., & Mobey, A. (2004). Action research to explore perceptions of risk in project management. International Journal of Productivity and Performance Management, 53(1), 18-32. DOI: https://doi.org/10.1108/17410400410509932
Raz, T., & Michael, E. (2001). Use and benefits of tools for project risk management. International journal of project management, 19(1), 9-17. DOI: https://doi.org/10.1016/S0263-7863(99)00036-8
Regulation, 2010 for Procurement of Consultancy Services..
State Bank of Pakistan (SBP) 2018, third quarterly report.
Wallace, P., & Blumkin, M. (2007). Major Construction Projects: Improving Governance and Managing Risks. Retrieved from www.deloitte.com
Wang, S. Q., Dulaimi, M. F., & Aguria, M. Y. (2004). Risk Management Framework for Construction Projects in Developing Countries. Construction Management Economi cs, 22(3), 237-252. DOI: https://doi.org/10.1080/0144619032000124689
WAPDA Progress report,2018 http://www.wapda.gov.pk/index.php/projects/hydro-power/under-construction/kurram-tangi-dam
Zhang, H. (2007). A redefinition of the project risk process: Using vulnerability to open up the event-consequence link. International journal of project management, 25(7), 694- 701. DOI: https://doi.org/10.1016/j.ijproman.2007.02.004
Zhou, P. X., Zhang, G. M., & Wang, J. (2007). Understanding the Key Risks in Construction Projects in China. International Journal of Project Management,25, 601-614. DOI: https://doi.org/10.1016/j.ijproman.2007.03.001
Copyright (c) 2021 Muhammad Huzaifa Butt, Shahid Iqbal, Muhammad Abubakar Siddique, Hamza Shahid
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
CSRC Publishing and JBSEE adhere to Creative Commons Attribution-Non Commercial 4.0 International License. The authors submitting and publishing in JBSEE agree to the copyright policy under creative common license 4.0 (Attribution-Non Commercial 4.0 International). Under this license, the authors published in JBSEE retain the copyright including publishing rights of their scholarly work and agree to let others remix, tweak, and build upon their work non-commercially. All other authors using the content of SBSEE are required to cite author(s) and publisher in their work. CSRC Publishing and JBSEE follow an Open Access Policy for copyright and licensing.